Water & Sanitation • Multiple ProvincesÁgua e Saneamento • Várias Províncias

Year2011
ProvinceMultiple Provinces
ClientBrisbane City Enterprises & SMEC
FunderWorld Bank

Project Overview

Enviestudos provided Technical Assistance (TA) to AIAS (Investment and Assets Administration of Water and Sanitation) for environmental and social assessment of water supply and sanitation investment projects across multiple provinces, financed by the World Bank. The work was carried out alongside Brisbane City Enterprises (Australia) and SMEC International.

AIAS manages water supply infrastructure across Mozambique’s secondary cities and towns, and this TA assignment helped build AIAS’s capacity to meet World Bank environmental and social safeguard requirements across its investment portfolio.

A Enviestudos prestou Assistência Técnica (AT) ao AIAS (Administração de Infra-estruturas de Água e Saneamento) para a avaliação ambiental e social de projectos de investimento em abastecimento de água e saneamento em várias províncias, financiada pelo Banco Mundial. O trabalho foi realizado em conjunto com a Brisbane City Enterprises (Austrália) e a SMEC International.

O AIAS gere infraestrutura de abastecimento de água nas cidades secundárias e vilas de Moçambique, e esta missão de AT ajudou a reforçar a capacidade do AIAS para cumprir os requisitos de salvaguarda ambiental e social do Banco Mundial.

AI-generated illustration of an elevated water tank on a concrete tower Illustrative imageImagem ilustrativa
Illustrative image created using AI. It is not a photograph of the actual project site.Imagem ilustrativa criada com recurso a inteligência artificial. Não é uma fotografia do local real do projecto.

Scope of Work

  • Environmental screening of AIAS water supply sub-projects across multiple provinces
  • Preparation of Environmental and Social Management Frameworks (ESMF)
  • Site-specific Environmental and Social Impact Assessments (ESIA) for priority investments
  • Capacity building: training AIAS staff in environmental screening and ESMP preparation
  • Review of contractor EMPs for water supply construction works
  • Technical guidance on World Bank Operational Policies for water sector projects
  • Triagem ambiental de sub-projectos de abastecimento de água do AIAS em várias províncias
  • Elaboração de Quadros de Gestão Ambiental e Social (QGAS)
  • Avaliações de Impacto Ambiental e Social (AIAS) específicas por local para investimentos prioritários
  • Reforço de capacidades: formação do pessoal do AIAS em triagem ambiental e elaboração de PGA
  • Revisão dos PGAs dos empreiteiros para obras de construção de abastecimento de água
  • Orientação técnica sobre as Políticas Operacionais do Banco Mundial para projectos do sector da água

Environmental Considerations

  • Water source protection: Assessment of groundwater and surface water source protection zones for each sub-project.
  • Sanitation & public health: Environmental health impacts of water supply improvements and associated sanitation.
  • Urban construction: Management of construction impacts in urban and peri-urban areas of secondary towns.
  • Community engagement: Consultation frameworks for communities affected by water supply infrastructure works.
  • Protecção da fonte de água: Avaliação das zonas de protecção das fontes de água subterrânea e superficial para cada sub-projecto.
  • Saneamento e saúde pública: Impactos na saúde ambiental das melhorias no abastecimento de água e no saneamento associado.
  • Construção urbana: Gestão dos impactos da construção em áreas urbanas e periurbanas das cidades secundárias.
  • Envolvimento comunitário: Quadros de consulta para as comunidades afectadas pelas obras de infraestrutura de abastecimento de água.

Results & Impact

The TA to AIAS helped systematise environmental and social safeguard implementation across AIAS’s World Bank-financed water supply portfolio, building institutional capacity within the sector that remained relevant beyond the project period.

A AT ao AIAS ajudou a sistematizar a implementação de salvaguardas ambientais e sociais na carteira de abastecimento de água financiada pelo Banco Mundial, construindo capacidade institucional no sector que permaneceu relevante para além do período do projecto.

World BankESIAWater SupplyAIASCapacity Building