Infrastructure • Maputo ProvinceInfraestrutura • Província de Maputo

Year2015
ProvinceMaputo
ClientSAI Consulting Engineers
FunderWorld Bank

Project Overview

Enviestudos conducted a full ESIA for a new bridge over the Incomati River at Magude Village in Maputo Province, financed by the World Bank and prepared for SAI Consulting Engineers. This bridge aimed to improve connectivity for communities on both sides of the river in southern Mozambique.

The Incomati River is an internationally significant transboundary watercourse shared by Mozambique, Swaziland, and South Africa, adding environmental complexity requiring careful assessment of cross-border hydrological impacts.

A Enviestudos realizou um EIA completo para uma nova ponte sobre o Rio Incomati na Aldeia de Magude, Província de Maputo, financiado pelo Banco Mundial e preparado para a SAI Consulting Engineers. Esta ponte visava melhorar a conectividade para as comunidades em ambos os lados do rio no sul de Moçambique.

O Rio Incomati é um curso de água transfronteiriço partilhado por Moçambique, Suzílandia e África do Sul, acrescentando complexidade ambiental que exigiu uma cuidadosa avaliação dos impactos hidrológicos transfronteiriços.

The wide Incomati River with reed islands and riverside vegetation
Representative image – the Incomati (Nkomati) River at Marracuene, Maputo Province. This is not the Magude bridge site. Photo: F Mira, CC BY-SA 2.0 – photo credits.Imagem ilustrativa – o Rio Incomati (Nkomati) em Marracuene, Província de Maputo. Não é o local da ponte de Magude. Foto: F Mira, CC BY-SA 2.0 – créditos fotográficos.

Scope of Work

  • Pre-feasibility Environmental Scoping Report
  • Terms of Reference (ToR) preparation and submission to ANAMA
  • Baseline surveys: aquatic ecology, riparian vegetation, hydrology, socioeconomics
  • Incomati River flood risk assessment and hydrological impact evaluation
  • Public consultation meetings with Magude community
  • Impact identification and significance evaluation
  • Full ESIA Report and integrated ESMP preparation
  • Relatório de Delimitação de Pré-viabilidade Ambiental
  • Elaboração dos Termos de Referência (ToR) e submissão ao ANAMA
  • Levantamentos de base: ecologia aquática, vegetação ripária, hidrologia, socioeconómica
  • Avaliação do risco de cheias e impacto hidrológico do Rio Incomati
  • Reuniões de consulta pública com a comunidade de Magude
  • Identificação e avaliação da significância dos impactos
  • Elaboração do Relatório Final de EIA e PGAS integrado

Environmental Considerations

  • Transboundary watercourse: Incomati River aquatic ecology and considerations for a watercourse shared across three countries.
  • Riparian & wetland habitats: Riverside vegetation and wetland ecosystems requiring protection during bridge construction.
  • Hydrology & flood risk: River flow assessment and flood resilience design requirements for the bridge structure.
  • Fishing community livelihoods: Impacts on fishing activities and river access for Magude communities.
  • Curso de água transfronteiriço: Ecologia aquática do Rio Incomati e considerações para um curso de água partilhado por três países.
  • Habitats ripários e húmidos: Vegetação ribeirinha e ecossistemas de zonas húmidas que requerem protecção durante a construção da ponte.
  • Hidrologia e risco de cheias: Avaliação do fluxo fluvial e requisitos de projecto de resiliência a cheias para a estrutura da ponte.
  • Meios de subsistência da comunidade piscatora: Impactos nas actividades de pesca e no acesso ao rio para as comunidades de Magude.

Results & Impact

The World Bank-compliant ESIA enabled the Magude bridge project to advance through the regulatory approval process, providing comprehensive documentation meeting both Mozambican licensing requirements and World Bank environmental and social safeguard standards.

O EIA em conformidade com o Banco Mundial permitiu que o projecto de ponte de Magude avançasse no processo de aprovação regulatória, fornecendo documentação abrangente que cumpria os requisitos moçambicanos e as normas de salvaguarda do Banco Mundial.

World BankESIABridgeIncomati RiverMaputo Province